In an accident at the Dharavi-Mahim Junction early Friday morning, a trailer collided with vehicles parked alongside the Mithi River, throwing five vehicles into the water. “The incident ...
A staggering 1650 crores have been spent on Mithi river development works alone, with a significant portion of it being spent on works that have yielded no tangible results. According to data ...
While 75% work on the 23.64-km corridor connecting Andheri West with Mandale in Mankhurd via Bandra Kurla Complex (BKC) is ...
When work on the Metro 2B corridor commenced in 2017, MMRDA had planned a cable-stayed arch bridge over Mithi river. “Construction for the cable-stayed bridge had begun, but had to be stopped as ...